bradford's first windmill was up and spinning in a stiff westward breeze at about 3 o'clck on july 22nd. hooking up the turbine and placing the pole went smoothly with on a couple of minor adjustments to the bolts. town bldg. inspector Trudy Willette was quick to arrive and give us final approval and a cert/occup.
looking at the pole before it went up gives some idea of its 45' length.
Mike wiring up the turbine and Will getting the bolts ready.
Erich Lake, Webster NH crane operator skillfully (and carefully) lifts the pole and turbine to "swing" it into position to be affixed to the base.